Details of Relevent Experience in Major Projects
|
Ceywater has a long history of active involvement in all aspects of water supply engineering, Urban Infrastructure Development, Project Management, Contract Administration and Construction Supervision Some of the major works carried out are listed thus:
|
JBIC assisted Water Supply for Towns North of Colombo (TNC) |
The Consultancy Services included detailed design for a water supply system to supply water to 6 major towns located North of Colombo city. The project involves Ground water reservoirs, Elevated water towers, Pump stations, Transmission mains and Distribution network.
|
 |
|
Ceywater is providing the Design and Construction Supervision services with Nihon Suido Japan as the Lead Consultant to the National Water Supply & Drainage Board. The total cost of the project is expected to be Rs. 5,800 Million.

|
ADB Assisted Urban Development Sector Project (UDSP)
|
Ceywater together with Parsons Engineering Science of USA provided Project Management Services for the entire project and Design & Construction Supervision services for a specified number of complex projects only, to the UDSP.
|
 |
 |
The project was focused to strengthen and provide improved infrastructure services, the technical, institutional and financial capacities of 17 selected Urban Local Authorities scattered throughout the Island , at a cost of US$ 36 Million.
The Design and Construction of High Priority Roads, Bridges and Intersections, Storm Water Drainage Systems and Water Supply infillings, low income area upgrading were the major components of infrastructure provided under the Project.
|
lthough, essentially this was a Project Management package, Ceywater was called upon to take over some of the complex sub projects for design and documentation.
Further, review of design work by the Design Consultants was part of the package, particularly in storm water & roads & bridges sectors. Training of ULA staff both Administrative and Technical Personnel for improved management, production of base maps using aerial surveys, development of Software for ULA needs, their usage with relevant training were integral components of the project.
|

|

|
Augmentation of Water Supply Schemes in Ampara, Nawalapitiya and Koggala and Koggala Sewerage Scheme in association with GKW of Germany |
Ceywater Consultancy Package included detailed designs and tender documentation for Water Intake Treatment Plant and Distribution Systems of 3 Major Urban Local Authorities having a population of over 100,000.
It also included the augmentation of water treatment facilities, design of new sewers for Koggala and Preparation of Master Plans for Solid and Liquid Waste Management in Ampara and Nawalapitiya areas. The Project cost was estimated at Rs.1531 Million.
|
Urban Development & Low Income Housing Project |
Ceywater was involved with Nippon Jego Suido Sekki of Japan as the Lead Consultant to provide Project Management Consultancy services to Urban Development & Low Income Housing Project (UDLIHP) with a project cost of US$ 100 Million.
The Project was intended to provide improvements to infrastructure of 27 major Urban Local Authorities in 7 Provinces covering Roads, Storm Water Drainage, Water Supply, Town Centres and Bus Terminii and Area upgrading of Low Income Households.
|

Road Development at Negombo (Project Management) |

Storm Water Drainage at Kurunegala (Project Management)
|
The Project also included a component to strengthen the Institutional Frame work and Financial status of ULAs by providing training for their staff in all facets of the work covering Technical Administrative and Accounting functions Under the Project, computers were provided to all the ULAs and their staff were trained in the use of Computer Software Packages specially designed to ULA activities.
|
Development of Horana Export processing Zone, Block C |

Road under Construction Horana HEPZ |
eywater Consultants provided consultancy services for land development, including physical planning, design and construction of roads, storm water drainage network, sewerage scheme, water supply distribution and so on for Board of Investment of Sri Lanka. The total cost of the Project was Rs 117 Million.
|

Water Tower under construction at HEPZ
|
|
ADB assisted Third Water Supply & Sanitation Sector Project “ Package C” |
The Ceywater Consultants in association with Groner, of Norway were engaged to carry out water resources management studies on four major rivers of the Island running through 6 large districts and groundwater studies in two other districts.
|
Survey of existing services |

Base mapping (Package C) |
It also covers the training and capacity building of institutions such as National Water Supply & Drainage Board, Local Authorities and NGOs at local level. It further included the preparation and production of digital topographic base maps, water distribution base mapping and a survey of the present status of irrigation management. The cost of the Project is estimated at US$ 350,000.
|
ADB assisted Third Water Supply & Sanitation Sector Project “ Package A” |
The Ceywater in association with COWI, Denmark are providing consultancy services to support in the Water Supply Augmentation and protection of existing sources including springs and wells. |
 |
 |
It also envisages to provide appropriate technologies for small pipe borne water schemes, rehabilitation of urban water supply schemes and augmentation of Anuradhapura Town Water Supply Scheme. In the sanitation sector, the provision of new and rehabilitation of individual and public latrines are included. A significant component of the project is to design and implement community awareness campaigns, training for local community mobilizations and support to CGOs and LGAs. Further it covers the study of the environmental impact assessment for the water supply & sanitation sector and carry out benefit monitoring and evaluation studies of sub projects.
|
ADB funded Secondary Towns Water Supply & Sanitation Project |
Ceywater provided Consultancy services with Coffey , Australia to carry out feasibility studies for Urban Water Supply Projects in Greater Battticoloa, Polonnaruwa, Muttur, Hambantota and Matara towns together with project preparation for North Central Province Rural Water Supply & Sanitation. It also included the preparation of Institutional development component for water sector, including Private Sector Participation and regulatory body, public awareness, training and information technology for Hambantota, Monaragala and Polonnaruwa districts for water resources assessment were also carried out.
|
Greater Galle Water Supply Project |
Hapugala Reservoir Galle |
The Greater Galle Water Supply Project is a Design Build and operate (turnkey) Contract where the Ceywater is providing local expertise to a Consortium of World renowned companies namely Samsung Corporation, and Kolon Engineering and Construction Company of the Republic of Korea . |
The project is geared to supply water requirement to the Greater Galle Area through a water intake of capacity 100,000 cum per day including a salinity barrier, pumping station, treatment plant and four ground reservoirs of having total capacity of 29,000 cum , transmission mains of 800, 600 and 400 mm dia pipes of lengths 5, 9, 11 km respectively including the distribution system consisting of DI and UPVC pipe lines, rider mains etc having a total length of 70 km of various diameters minimum being 110 mm. The total cost of the project is expected to be Rs. Three Billion (3 0 Billion). |

Hapugala Ground Reservoir Galle
|
Technical Assistance Programme (PPTA) for the Urban Development & Low Income Housing Project |
Ceywater provided most of the local consultancy services with 16 experts to a Consortium of International Consultants comprising PADCO of USA, GHK and BTI of UK, recruited by the ADB. The work involved the study of existing infrastructure facilities in 51 Urban Local Authorities including their financial and human resources available as at the time of study. |
|
|
The objective was to select the specific number of ULAS having the highest potential for economic growth given the necessary infrastructure facilities together with the institutional and financial strengthening of such ULAs.
|
Consultancy Services for Improvements to Water Distribution and Treatment plant installation to Sri Lankan Airlines at the Colombo International Airport
|
Consultancy services included the study of existing water supply & distribution system and propose changes and additions needed to supply water requirement for drinking and of other logistical purposes including supply of quality water for aircrafts.
The above projects include only some of the major works carried out by Ceywater Consultants. A more detailed description of each of the above projects including many others not summarized above are given in the foregoing pages.
|
Water and Environmental Sanitation Assessment |
Water and Environmental Sanitation Assessment in Conflict-affected areas in Sri Lanka for UNICEF, providing present status of water supply & sanitation of the population and cost for restoring water supply and sanitation facilities to primary schools and health institutions.
|

Water facilities in typical primary school |
Pola Building at Tissamaharama
(Project management ) |
The other projects, which have been completed, include the following:
Project for improvement to water supply systems in Galle and Matara Districts (JETRO).
Detailed Design study on the Project for Reduction of Non Revenue Water in the Greater Colombo Area (JICA).
Polonnaruwa Water Supply & Sanitation Pre-Investment Study (ADAF).
Restructuring of Urban Development Authority.
Feasibility Study for Improvements to Water Supply System in Greater Galle for JICWELS / National Water Supply and Drainage Board.
Pre-feasibility Study for Hambantota District Water Supply Scheme for JICA / NWSDB.
Strengthening Quality Infrastructure for the fisheries Industries in Sri Lanka in association with HIFAB International AB, Sweden .
|
Ceywater undertook planning Designs and supervision of the installation of Interior Arrangement at the new Head Office Building for Department of Immigration & Emigration Colombo.
Beira Lake Sewerage Project – Phase I (World Bank).
Greater Colombo Water Supply and Sanitation Master Plan (UNDP).
Towns East of Colombo Water Supply Project (OECF).
Urban Low Cost Sanitation (UNCHS/UNDP).
Greater Colombo Water Supply Master Plan Upgrade (USAID). Feasibility and Detailed Design for the Water Supply Sector Project covering 40 Towns scattered in Sri Lanka (ADB).
TNC -Ragama |

Bridge at Hambantota (Project Management) |

Contract Management for the Water Supply Sector Project covering Central Region of Sri Lanka (ADB).
|
Formulation of the proposed Institutional Wastewater Treatment Plants under BOO/BOT terms with Parsons Engineering Science Inc (WB).
Water Supply and Sanitation Programme of Plantation Corporation (MTIP/SWP).
Design for Sewage Treatment Plant and Disposal Scheme for Army Camp, Boossa.
Water Supply and Sewerage Improvements to Negombo Hospital .
Feasibility Study – Rehabilitation of Galpihilla & Ketandola Estates Water Supply Scheme.
Construction of Pre- Fabricated Steel Buildings for Cargo Storing & Sorting Area at Cargo Terminal at Sri Lankan Airlines, Katunayake.
Baseline Survey on Facilities of Agrarian & Farmer Training Centers (FTCs) in the North & Eastern Province.
Consultancy Services for Project preparation on Improvements of Water Availability for Water Supply Schemes for Mahaoya.
Consultancy Services for Developing a Strategy for Implementation of Second Community Water Supply & Sanitation Project in Northern and Eastern Provinces in association with SMEC International Pty Limited, Australia
Project Management Support for the Proposed back office processing / call center at Rajagiriya for the Board of Investment of Sri Lanka.
Project for Improvement to water supply systems in Galle and Matara Districts (JETRO).
Detailed Design Study on the Project for reduction of Non Revenue Water in the Greater Colombo Area (JICA).
Greater Colombo Waste Water Management Review in association with Koei Co. Ltd., Japan .
Supply, Installation and Commissioning of 25cum/hour Capacity Package Water Treatment Plant & Associated Civil Works at Sri Lankan Airlines, Katunayake.
Technical assistance and Preparation Support for the Proposed Second Community Water Supply & Sanitation Project in association with Coffey MPW Pty Ltd, Australia .
|
| |
|